- Feasibility study to rationalize and expand publing parking areas in the municipality of Chiomonte (TO).
[Client: Iren Energia Spa]
- Preliminary Environmental screening for the realization of ground-mounted solar farms in the municipalities of Candela (FG), Veglie (LE).
[Client: Emeraald Snale Srl]
- Feasibilty study for the development of a ground-mounted solar farm (30 MWp – 46 ha) in the municipality of Poirino (TO).
[Client: Ternavasso Sun Srl]
- Feasibilty study for the hydroelectric exploitation of the Orsiera-Touron stream. To assess the opportunity of evamping the existing SHPP and drinking water network located in the municipality of Chiomonte (TO). - Joint project developed with Studio ALFA SpA
[Client: Iren energia]
- Ante-operam monitoring of soil hydraulic properties in the municipalities of: Caponago, Gessate, Pessano con Bornago, Melegnano, Trucazzano and Vizzolo Predabissi (MI) for the construction of the new Milano’s bypass.
[Client: Seacoop Scarl]
- Environmental Impact Study and authorization development for the realization of ground-mounted solar farm Ghiaro (5.41 MW) in the municipality of Crescentino (VC).
[Client: Emeraald Snale Srl]
- Technical assistance to obtain a grant from the National Institute for Insurance against Accidents at Work (INAIL) for the removal and decontamination of asbestos from a private facility.
[Client: Auto Car Srl]
- Coordination and technical-administrative consultancy for the preparation of a grant request (Programma PAR FSC 2007-2013, Asse III “Riqualificazione territoriale” – Linea d’Azione 2: “Messa in sicurezza dell’ambiente montano” Interventi di “Sviluppo della filiera bosco energia")
[Client: Municipality of Robilante (TO)]
- Ante-operam monitoring of soil hydraulic properties in the municipalities of: Casalmaiocco, Vizzolo Predabissi and Cerro al Lambro (MI) for the construction of the new Milano’s bypass.
[Client: SeaCoop Scarl]
- Calculation of the Minimum Vital Flow of an agricultural water diversion structure on the "Bealera Marghera" channel - Municipality of Savigliano (CN).
[Client: Azienda Agricola Allasia Franco]
- Coordination, support and consultancy for the development of hydroelectric projects in the Serbian Republic.
[Client: Studio Frosio Srl]
- Toporaphical and bathymetric survey, preliminary design and cost estimation of the works to consolidate the shore of the "delle Commende Bianche" basin in the municipality of Carmagnola (TO).
[Client: Azienda Agricola Salvi del Pero di Luzzano Lodovico]
- Soil sampling campaign according to the “Linee guida per il monitoraggio dei suoli su superfici agricole destinate ad impianti fotovoltaici a terra” (Regione Piemonte), in the solar farms “Banna1”, "Banna2", "Ternavasso 1" e "Ternavasso 2". Municipalities di Riva Presso Chieri and Ternavasso (TO).
[Clients: Chorus Solar Banna 3 Srl & C. Torino Due Sas, Chorus Solar Banna 5 Srl & C. Torino Uno Sas, Chorus Solar Toscana 5 Srl & C. Ternavasso Uno Sas, Chorus Solar Toscana 5 Srl & C. Ternavasso Due Sas]
- Collaboration for the development of the project "Chiomonte 2025", and implementation of the sub-project focused on the "Frais" hamlet.
[Client: Chiomonte Imprend'Oc]
- Consultancy for the elaboration of the "Update reports" of the photovoltaic power plants “GHIARO” and “GHIARO 2”.
[Client: MEG Contractor]
- Geoelectrical mapping of soil resistivity within the fields of the «Centro di ricerca per le produzioni foraggere e lattiero-casearie di Lodi» (CREA-CFP).
[Client: Dipartimento di scienze della terra e dell’ambiente e del territorio - Università Milano Bicocca]
- Ante-operam monitoring, technical and administrative consultancy for the authorization development of a run-of-the-river hydroelectric power plant on the Sangonetto stream.
[Committente: Spring Srl]
- Photointerpretation, classification and quality control of the terrestrial habitats of the Republic of Croatia.
[Client: TIMESIS Srl]
- Consultancy and support for the preparation of tender documents to make safe the “Lago d'Idro“ lake.
[Client: GEODATA ENGINEERING Spa]
- Development of the ERDF research project “CIRCE” (Cooperative Internet-of-Data Rural-alpine Community Environment) to implement an ICT platform to acquire, store and manage meteorological, hydrological data for research, soil conservation, water management.
[Financing body: Finpiemonte Spa]
- Technical assistance to obtain a regional grant (Misura 4.2.1) funded by the PSR 2014-2020 of the Lombardia Region.
[Client: Società Agricola S. Giuseppe s.s. dei F.lli Ferrari]
- Ante-operam monitoring of soil hydraulic properties in the municipalities of: Paullo, Comazzo, Pozzuolo Martesana, Trucazzano, Mulazzano, Liscate, Gorgonzola, Dresano, Vizzolo Predabissi and Cerro al Lambro (MI) for the construction of the new Milano’s bypass.
[Client: Seacoop Scarl]
- Geoelectric and Geomagnetic soil survey to map inorganc pollutants in the sites of “San Giuseppiello” and "Ecobat" (NA).
[Client: Università degli Studi di Napoli - Federico II]
- Green areas management services in the solar farms “Banna 1” and “Banna 2”. Municipality of Riva Presso Chieri (TO).
[Clients: Chorus Solar Banna 5 Srl & C., Chorus Solar Banna 3 Srl & C.]
- Development of the Agrifoodie App funded by the Fractals Call (FP7) to create a mobile app to shorten supply chains in the agrifood sector and foster direct selling of local food products.
[Financing body: Fractals Bank]
- Chemical, physical and biological (IBE, STAR_ICMi indexes) water quality survey for the authorization of a SHPP on the mountain stream "Tesso" (TO).
[Client: Hei-Energy Srl]
- Consultancy and support to prepare the technical-environmental documentation to authorize two SHPP projects on the mountain stream "Enza".
[Client: Hei-Energy Srl]
- Consultancy and support for the botanical classification of urban vegetation of Istanbul for the construction of the new subway line.
[Client: Geodata Engineering Spa - Merkezi Italiya Ankara Şubesi]
- Pedologic surveying service for the realization of the soil map of the Lazio region (1:250.000 scale), including in-depth analyses at 1:50.000 scale.
[Client: Arsial – Agenzia Regionale per lo Sviluppo e l’Innovazione dell’Agricoltura del Lazio (Lazio Region)] – Work in progress
- Study, design, and authorization development for the realization of a run-of-the-river hydroelectric power plant in the province of Torino (Pn < 100 kW).
[Client: Spring Srl] – Work in progress
- Conception and co-founding of a company under the laws of the Serbian Republic for the development of 20 renewable energy power plants (hydropower) 0,2 MW < Pn > 4 MW, for a total of a 20 MW.
[Client: e-Ren Energy Group Doo] – Work in progress
- Flow measurement, installation of three staff gages and elaboration of a stage-discharge curve on the Piantonetto stream, municipality of Locana.
[Client: Ente Parco Nazionale Gran Paradiso]
- Nivologic report to assess the influence of the widening of a ski slope on avalanche dynamics - municipality of Chiomonte.
[Client: Frais 2010 - Località Pian Fraisian snc]
- Technical assistance to obtain a regional grant (Misura 1.2.1) funded by the PSR 2007-2013 of the Liguria region.
[Client: Azienda Agricola Giovese]
- Develpoment of an hydraulic model to assess water discharge in the Dolca stream (BI).
[Client: 3A Srl]
- Ante-operam monitoring of soil hydraulic properties in the municipalities of Paullo and Gessate for the construction of the new Milano’s bypass.
[Client: Seacoop Scarl]
- Technical assistance for the submission of a funding request (ERDF funds) for the sustainable development of mountain areas by means of a wood-energy supply chain.
[Client: Municipality of Robilante (CN)]
- Geological survey for the authorization development of the hydroelectric power plant Ar.mo on the Lusignetto stream in the municipality of Ala di Stura.
[Client: CAFE Industriale Srl]
- Consultancy and support for the exploitation of hydroelectric opportunities within the Serbian Republic.
[Client: TerEnCons d.o.o.]
- Extraordinary maintenance of the environmental mitigation works in the solar farms “Montemarzino Green” and "Cortiglione Green“.
[Client: TERZACONTRACT Srl]
- Soil sampling campaign of the solar farm “Ternavasso” (7405,2 kWp – 21,1 ha) following the: “Linee guida per il monitoraggio dei suoli su superfici agricole destinate ad impianti fotovoltaici a terra” (Regione Piemonte). Municipality of Poirino (TO).
[Clients: Quattordicesimasun Srl, Quindicesimansun Srl]
- Sylvicultural management of a wood area (3 ha) on the right bank of the Tanaro river in the municipality of Pietra Marazzi (AL).
[Client: Brezzi Romano Giorgio e Giuseppe Sas]
- Design, realization and construction supervision of the mitigative and environmental compensation works for the landscape integration of 8 Biogas plants in the Alessandria Province.
[Clients: Società Agricole Quargnento Ss, Pecora Biogas Ss, Biogas Castelnuovo B.Da Scarl, Biogas Occimiano Scarl, Piantari Scarl, Ventorino Fulvio, Biogas Castellazzo Bormida Società Agricola Ss] – Work in progress.
- Soil sampling campaign of the solar farm “Banna” (9115,2 kWp – 16 ha) following the: “Linee guida per il monitoraggio dei suoli su superfici agricole destinate ad impianti fotovoltaici a terra” (Regione Piemonte). Municipality of Riva Presso Chieri (TO).
[Clients: Chorus Solar Banna 3 Srl & C. Torino Due Sas, Chorus Solar, Banna 5 Srl & C. Torino Uno Sas]
- Development of an hydraulic model to assess the discharge of the mountain stream named “Torrente Dolca” – Biella. Development of a discharge hydraulic model using the current-meter method.
[Client: 3A Srl]
- Emerging market analysis and development of investment projects in the Balkan area – Serbian Republic.
[Client: TerEnCons Doo]
- Study, design, and authorization development for the realization of a run-of-the-river hydroelectric power plant in the province of Torino (Pn 893 kW).
[Client: HEI- ENERGY Srl] – Work in progress
- Evaluation of soil hydraulic parameters and inflow/outflow simulation of a landfill located in the municipality of Porto Torres (SS) – “Cava Gessi”.
[Client: Timesis Srl]
- Technical due-diligence of the authorization of the hydroelectric power plant “Ala di Stura”. Technical and administrative historic analysis (1993-2013) aimed to reconstruct the main steps of the authorization process of the hydroelectric power plant project located in the municipality of Ala di Stura (TO).
[Client: Partecipazioni Srl]
- Conception and development of the U.H.T. (Urban Hydro Technologies) feasibility study for the energetic restoration of the channel network of the City of Torino, in collaboration with local SMEs and the Polytechnic of Torino.
[Financing body: Finpiemonte Spa]
- Feasibility study for the realization of a wood biomass trade and logistic center and the development of wood biomass power plants for the production (cogeneration) of electric and thermal energy in the Municipality of Mombercelli. (AT)
[Client: BIO.MASS.TECH Srl]
- Geotechnical surveys for the realization of the solar farms: “Castelnuovo Belbo Green” (395,6 kWp – 1,45 ha), “Incisa Scapaccino Green” (1384,6 kWp – 1,94 ha), “Castello di Annone Green 3” (593,4 kWp – 2 ha). Municipalities of :Castelnuovo Belbo (AL), Incisa Scapaccino (AL), Castello di Annone (AL).
[Client: SGP Srl]
- Topographic tracking for the realization of the ground-mounted solar farms: “Sulpiano Cross” (2528,6 kWp), “Castello di Annone Green 3” (593,4 kWp – 2 ha), “Avolasca Green” (593,4 kWp – 1,46 ha), “Castelnuovo Belbo Green” (395,6 kWp – 1,45 ha), “Incisa Scapaccino Green” (1384,6 kWp – 1,94 ha), “Castello di Annone Green 3” (593,4 kWp – 2 ha). Municipalities of Montà (CN), Castello di Annone (AT), Avolasca (AL), Castelnuovo Belbo (AL), Incisa Scapaccino (AL), Castello di Annone (AL).
[Clients: Ventesimasun Srl, SGP Srl]
- Preliminary design for the reactivation of the hydraulic head of the old water-powered factory “Novarina”, municipality of Bibiana (TO).
[Client: Floema professionisti Associati]
- Preliminary design of a right bank earth embankment of the Tanaro river in the municipality of Pietra Marrazzi (AL).
[Client: Brezzi Romano Giorgio e Giuseppe Ss]
- Landscape report for the realization of a right bank earth embankment of the Tanaro river, municipality of Pietra Marrazzi (AL).
[Client: Brezzi Romano Giorgio e Giuseppe Ss]
- Topographic survey for the realization of the civil works in the areas outside the Moncalieri’s Technological Park (TO).
[Client: Cauda Strade Srl]
- Environmental regulations analyses for the realization of roof-mounted photovoltaic installations in the municipalities of: Poirino (TO), Settimo Torinese (TO), Sant’Antonino di Susa (TO), Occhieppo Inferiore (TO), Borgo Neive (CN), Castiglione Tinella (CN).
[Clients: Spsun Srl, Solesa Srl, Agsun Srl]
- Geotechnical reports and hydrogeological surveys n the industrial areas of the municipalities of: Poirino (TO), Sant’Antonino di Susa (TO), Settimo Torinese (TO), Castiglione Tinella (CN), Costigliole d’Asti (AT).
[Clients: Spsun Srl, Solesa Srl]
- Landscape reports for the realization of roof-mounted photovoltaic installations in the municipalities of: Poirino (TO), Sant’Antonino di Susa, Mongrando (BI), Castigliole d’Asti (AT), Neive (CN), Castiglione Tinella (CN), Serralunga d’Alba (CN) , Sanremo (IM).
[Clients: Spsun Srl, Solesa Srl, Biellasun Srl, Sanremo (IM)]
- Setup of a hydraulic model for the determination of the minimum environmental flow level of a water diversion structure placed in the “Oasi Zegna” (BI).
[Client: 3a Srl]
- Topographic tracking works for the realization of six Biogas plants within the Alessandria Province..
[Client: Sam Engineering Srl]
- Topographic survey or the realization of the agricultural shelter “Masio” and the pertaining photovoltaic installation.
[Client: SGP Srl]
- Preparation of the biomass supply plan and technical assistance for authorizing the wood biomass cogeneration plant in the municipality of Torrazza Piemonte.
[Client: Artepura Srl]
- Report on the biodiversity of irrigation channels and the mitigation of impacts on fish and benthic macroinvertebrates populations.
[Client: Federazione Provinciale Coldiretti - Cuneo]
- Design, and execution of environmental and landscape integration of the agricultural shelter “Masio”.
[Client: SGP Srl]
- Soil survey campaign for the evaluation of nitrogen and organic carbon content in the agricultural soils of the Lombardia Region “ERSAF Monitoraggio 2012”.
[Client: Timesis Srl]
- Executive design of stormwater drainage works of the agricultural shelter “Masio”.
[Client: Trentasettesimasun Srl]
- Study and design of the landscape integration works for the realization of a residential complex in the municipality of San Mauro Torinese (TO).
[Client: Artepura Srl]
- International development aid project “H2Ortisol”. Design and realization of solar-powered vegetable gardens in Beud Dieng (Senegal).
[Financing Body: Fondazione Cariplo]
- Environmental regulations analyses ffor the realization of gound-mounted solar farms. Works performed in the municipalities of: Pomezia (RM), Genzano di Roma (RM), Larino (CB), Rottofreno (PC), Tarquinia (VT), San Giovanni al Natisone (UD), Alessandria (AL), Frugarolo (AL), Collegno (TO), Mondovi (CN), Grosseto (GR), Cavallermaggiore (CN), Fiumicello (UD), Atessa (CH), Tortona (AL), Mede (PV), Massa Lombarda (RA), Costigliole (AT), Mongrando (BI).
[Clients: Solesa Srl, Fotowatio Italia Srl, Biellasun Srl]
- Topographic surveys and realization of plano-altimetric models in the installationn areas of the ground-mounted solar farms: “Cortiglione Green” (791,2 kWp – 2,09 ha), “Incisa Scapaccino Green” (1384,6 kWp – 1,94 ha), “Avolasca Green” (593,4 kWp – 1,46 ha), “Castello di Annone Green 3” (593,4 kWp – 2 ha), “Castelnuovo Belbo Green” (395,6 kWp – 1,45 ha), “Montemarzino Green” (791,2 kWp – 2,5 ha. Municipalities of: Montemarzino (AL), Cortiglione (AT), Incisa Scapaccino (AT), Avolasca (AL), Castello di Annone (AT), Castelnuovo Belbo (AL).
[Client: Vermessungsburo, SGP, Flyren group]
- Design, realization and construction supervision of the mitigative and compensation works of the solar farm “Cortiglione Green” (791,2 kWp – 2,09 ha). Municipality of Cortiglione (AL).
[Client: Solarhybrid AG]
- Design, realization and construction supervision of the mitigative and compensation works of the solar farms: “Montemarzino Green” (791,2 kWp – 2,5 ha), “Avolasca Green” (791,2 kWp – 2 ha), “Castello di Annone Green 3” (593,4 kWp – 2 ha), Castelnuovo Belbo Green” (395,6 kWp – 1,2 ha), “Incisa Scapaccino Green 2” (593, kWp – 1,94 ha). Municipalities of: Montemarzino (AL), Avolasca (AL), Castello di Annone (AT), Castelnuovo Belbo (AT), Incisa Scapaccino (AT).
[Clients: SGP Srl, CP Contract Power Srl, Terza Contract Srl]
- Topographic survey and stacking f the installation area of a solar farm in the Municipality of Barge (CN).
[Client: Draka Service]
- Agronomical report and preventive soil survey in the installation areas of the solar farms: “Ternavasso” (7405,2 kWp – 21,1 ha) and “Banna” (9115,2 kWp – 16 ha). Municipalities of Poirino (TO) and Riva Presso Chieri (TO).
[Clients: Quattordicesimasun Srl, Quindicesimasun Srl]
- Design, realization and construction supervision of the mitigative and compensation works of the solar farm “Banna” (9115,2 kWp – 16 ha). Municipality of Riva Presso Chieri (TO).
[Client: Solesa Srl]
- Design, realization and construction supervision of the mitigative and compensation works of the solar farm “Ternavasso” (7405,2 kWp – 21,1 ha). Municipality of Poirino (TO).
[Clients: Quattordicesima Srl, Quindicesimasun Srl]
- Topographic and plano-altimetric surveys in the installation area of a solar farm in the municipality of San Sebastiano da Po (TO).
[Client: Newcon Energy Deutschland GmbH]
- Environmental Impact Study and authorization development ffor the realization of ground-mounted solar farms: “Odorisio” (1985,36 kWp – 8,4 ha), “Teatino” (992,7 kWp – 4,8 ha), “Bisenzio” (4982 kWp – 8,9 ha), “I Canneti” (14917,8 kWp – 30,2 ha), “Chiaroni” (4145,4 kWp – 13,2 ha). Comuni di Furci (CH), San Buono (CH), Capodimonte (VT), Rovigo (RO), San Martino di Venezze (RO).
[Clients: Ventiseiesimasun Srl, Ventisettesimasun Srl, Ventottesimasun Srl, Trentunesimasun Srl, Trentaduesimasun Srl]
- Preventive soil survey in the installation areas of the solar farms: “Cortiglione Green” (791,2 kWp – 2,09 ha), “Montemarzino Green” (791,2 kWp – 2,5 ha), “Avolasca Green” (593,4 kWp – 1,46 ha). Municipalities of: Cortiglione (AT), Montemarzino (AL), Avolasca (AL).
[Clients: TerzaContract Srl, SGP Srl]
- Development and realization of a thematic cartography or the detection of the suitable areas for the installation of ground-mounted solar farms in the Pimonte Region.
[Client: SGP Srl]
- Topographic and plano-altimetric surveys in the installation areas of the solar farms: “Achillea”, “Incisa Scapaccino Green 3”, “Incisa Scapaccino Green 2”.
[Clients: Ventunesimasun Srl, SGP Srl]
- Hydraulic study and design of a water drainage system in the installation areas of the solar farm “Banna” (9115,2 kWp – 16 ha).
[Client: Solarhybrid AG]
- Report on the wildlife within the municipality of Civita Castellana (VT) -district of “Piano di Santa Maria”.
[Client: Ventitreesimasun Srl]
- Writing of the environmental analysis, perception analysis and photosimulations concerning the authorization of a solar farm in the municipality of Collegno (TO).
[Client: Solesa Srl]
- Agrometeorological survey for the evaluation of the influence of photovoltaic structures on the microclimatic conditions of the solar farm “Banna” (9115,2 kWp – 16 ha).
[Client: Solesa Srl]
- Executive design of a gabion retaining wall for the stabilization of a slope near to the solar farm “Avolasca Green” (593,4 kWp – 1,46 ha).
[Client: Flyren Group].
- Authorization development and preparation of the environmental documents for the realization of the Biogas power plants: “Fraccongiu” (999 kWe) and “Beimiafattu” (999 kWe). Municipalities of Arborea (OR) and Terralba (OR).
[Clients: Globalsun 2 Srl, Globalsun 3 Srl]
- Environmental Impact Study and authorization development for the realization of the ground-mounted solar farms: “Achillea” and “Artemisia” (6159,4 kWp - 12 ha), “I Girasoli” (1429,22 kWp - 4 ha), “Sassacci” (6110 kWp – 12,6 ha), “Anatrino” (992,68 kWp – 2,5 ha), “Lagaccione - lot 2” (2574 kWp – 7,3 ha) “Banna” (9115,2 kWp – 16 ha), “Gli Elementi” (24057 kWp – 71,5 ha), “Prometeo” (992,68 kWp – 5 ha), “Poggio Solar” (923,91 kWp – 1,8 ha), “Isolina” (4999 kWp – 19,5 ha). Municipalities of: Carentino (AL), Oviglio (AL), Civita Castellana (VT), Anagni (FR), Lagaccione (VT), Riva Presso Chieri (TO), Colleferro (RM), Palestrina (RM), Poggio San Marcello (AN), Torre De Picenardi (CR).
[Clients: Solesa Green Power, Fotoquattordici Srl]
- Agronomic and vegetation report concerning the installation areas of the ground-mounted solar farms “Achillea” and “Artemisia” (6159,4 kWp - 12 ha), “I Girasoli” (1429,22 kWp - 4 ha). Municipalities of Carentino (AL) and Oviglio (AL).
[Client: Ventunesimasun Srl]
- Landscape analysis for the authorization development of the solar farm “Sassacci” (6110 kWp – 12,6 ha). [Client: Solesa Green Power].
- Landscape analysis for the realization of roof-mounted photovoltaic installations on residential buildings in the municipalities of Rivoli (TO) and Zimone (BI).
[Clients: Pagliasso Orlando, Raviglione Alba]
- Vocational training services for the course “Technician for the installation of photovoltaic systems”.
[Client: C.I.O.F.S. – F.P. Piemonte]
- Preliminary Environmental Study and authorization development of the solar farms: “Adelchi” (5166,62 kWp - 16 ha), and “Ageltrude” (1985,36 kWp - 5 ha). Municipalities of Macerata (MC) and Pollenza (MC).
[Clients: Globalsun 3 Srl, Globalsun 2 Srl]
- Landscape analysis for the realization of a solar installation (2326,5 kWp) on the roof of an industrial building (CRAB) in the municipality of Robassomero (TO).
[Client: Solesa]
- Geotechnical surveys in the installation areas of the ground-mounted solar farms “Banna” (9115,2 kWp – 26,23 ha), “Ternavasso” (7405,2 kWp – 21,1 ha) and “SulPiano Cross” (2532 kWp – 8 ha). Municipalities of: Poirino (TO), Riva Presso Chieri (TO), Montà (CN).
[Client: Solesa Green Power]
- Environmental regulations analyses for the realization of ground-mounted solar farms. Municipalities of: Torre De’ Picenardi (CR), Giarole (AL), Salussola (BI), Casale Monferrato (AL), Imola (BO), Massa Lombarda (RA), Mordano (BO), Lugo (RA), Alagna (PV), Crevalcore (BO), Cassano d’Adda (MI), Pozzuolo Martesana (MI).
[Client: Fotowatio Italia Srl]
- Environmental Impact Study, preparation of the environmental documentation and authorization development of the solar farm “Solar Lakes” (37637,6 kWp – 118,6 ha). Municipality of Ardea (RM).
[Client: Solesa Green Power]
- Realization of plano-altimetric models in the installation areas of the solar farms: “Ternavasso” (7405,2 kWp – 21,1 ha), “Banna” (9115,2 kWp – 16 ha), “SulPiano Cross” (2532 kWp – 8 ha). Municipalities of Poirino (TO), Riva Presso Chieri (TO), Montà (CN).
[Client: Solesa Green Power]
- Project “Comuni Green” Preparation of the environmental documents for the installation of the ground-mounted solar farms: “Incisa Scapaccino Green 2” (593,4 kWp – 1,9 ha), “Cortiglione Green” (791,2 kWp – 2,1 ha), “Terzo Green” (791,2 kWp – 2 ha), “Castelnuovo Belbo Green” (395,6 kWp – 1,45 ha), “Avolasca Green” (593,4 kWp – 1,5 ha), “Montemarzino Green” (791,2 kWp – 2,5 ha), “Felizzano Green” (395,6 kWp – 2 ha), “Cartosio Green” (197,8 kWp – 1 ha), “Castello di Annone Green 3” (593,4 kWp – 2 ha), “San Martino in Strada Green” (593,4 kWp – 3,6 ha), “Castelnuovo Bocca d’Adda Green 2” (395,6 kWp – 1,2 ha), “Castelnuovo Bocca d’Adda Green 3” (395,6 kWp – 1,2 ha), “Caselle Landi Green” (593,4 kWp – 3 ha). Municipalities of: Incisa Scapaccino (AT), Cortiglione (AT), Terzo (AT), Castelnuovo Belbo (AT), Avolasca (AL), Montemarzino (AL), Felizzano (AL), Cartosio (AL), Castello di Annone (AT), San Martino in Strada (LO), Castelnuovo Bocca d’Adda (LO), Caselle Landi (LO).
[Clients: Solesa Green Power, Flyren group]
- Preliminary Environmental Study and authorization development for the realization of the ground-mounted solar farms: “Castellaccio” (15688,26 kWp – 22,5 ha) “Parrizzo” (998,66 kWp – 14,24 ha), “Lagaccione” (2036 kWp – 4,86 ha), “Ternavasso” (7405,2 kWp – 21,1 ha), “I Pianeti” (34468,2 kWp – 83 ha), “SulPiano Cross” (2532 kWp – 8,08 ha). Municipalities of Fiumicino (RM), Nicosia (EN), Lagaccione (VT), Poirino (TO), Montalto di Castro (VT), Montà (CN).
[Clients: Solesa Green Power, Solesa Srl, Settimasun Srl]
Ante-operam monitoring of soil hydraulic properties in the municipalities of: Caponago, Gessate, Pessano con Bornago, Melegnano, Trucazzano and Vizzolo Predabissi (MI) for the construction of the new Milano’s bypass.